1 - Data Centre Design/Life Cycle Overview
Overview of the phases of a data centre life cyclePlanning, re-alignment and continuous improvement
2 - Standards and Rating Level Definitions
Rating level historyDifference between Uptime and TIA-942Rating level definitionsRedundancy options (N+1), 2N, 2(N+1)Concurrent Maintainability/CompartmentalisationExample configurationsSubstation and feed requirementsMaintenance optionsOperational processes guidelines/standardsSkill development
3 - Building Considerations
Building location considerationsFloor and hanging loads requirementsFire rating for walls and glassBlast protectionBullet proofingForced entry protection
4 - Advanced Raised Floor & Suspended Ceiling
Raised floor installation guidelinesTechniques to install a proper and leveled raised access floorCommon mistakesChoosing the right tiles and their locationsSeismic-mitigating floor constructionsChoosing the correct suspended ceiling
5 - Advanced Power
Power infrastructure layout;Formulas which you should know for the data centreSingle Line Electrical diagrams; how to read to ensure key components are present for protectionOver current protection devices (MCB/MCCB/VCB/ACB/Fuses) definitions and what to use whereEarth Leakage devices (RCB/RCD/ELCB/GFCI/ALCI/RCBO), definitions and what to use whereSizing of protective componentsLightning strikes and surge protection devices (TVSS/SPD), how they operate, where to use and how to installPower cabling and cable run considerationsPDU/DB setup and minimum requirementsGenerators;Generator types: Standy/Prime/ContinuousComponent make up and functionsFuel storage and calculationParalleling of gen-setsGenerator room/area requirementsUPS Systems;Required specifications for UPS systemsHow to read data sheets and select the correct UPSRequirements for parallel configurations and avoid pitfalls such as single point of failuresHow parallel installation should be done, classic mistakes made by installers and how to avoid theseHarmonic Filters;Active/Passive filters and their applicationBattery Banks;Battery bank terminologyDesigning battery banks, how to calculate, and double check the battery bank to be installedBattery charging pitfalls and ensuring the right charger is being installed and usedUsing parallel battery banks; how to properly install them, limitations and risks when using batteries in parallelHow to test batteries correctly and make decisions on cell/block or string replacementBattery casing choices; ABS, V0, V1, V2Alternative energy storage; flywheel, re-usable cell, compressed air UPS, etc.
6 - Advanced Electro Magnetic Fields
Sources of EMFDifference between single, three phase and bus-bar EMFOptions available to measure EMF and how to interpret the results from single-axes and composite measurementsGuidance on safe distance for equipment and humansCalculation of EMF attenuation factor for shielding material permeability and saturation factors
7 - Advanced Cooling
Important definitions; dry-bulb, wet-bulb, dew-point, RH, sensible and latent heatPsychometric chart and ASHRAE recommendationsEnvironmental class definitions and thermal specificationsTemperature/humidity measurements guidelineHeat dissipation methodsAltitude impact on temperature intake to ICT equipmentFloor plan setup for effective coolingDifferences in tile surface and supporting structure and the air-flow performance impactRack door construction and the flow performance impactEquipment Delta-T and its impactOptimising air flowThermal units conversionsCalculations for air volume displacement (CFM/CMH)Cooling capacity calculationsAir-conditioning selectionDe- / humidifying optionsAir conditioning efficiencySHR impact on cost savingEfficiency indicatorNew cooling principle and techniques (Submerged, VSD/VRF/ECF/water- and air side economisers)Redundancy guidelines for air-conditioners avoiding classic misconceptions and mistakes for meeting ANSI/TIA-942 compliant designsInstallation requirementsConnections to fire panel and EPOCommissioning of air conditionersSet points and calibrationCFD (Computational Fluid Dynamics)
8 - Advanced Fire Protection
The fire triangle and elements to stop a fireDetection systems in detail (VESDA, VIEW, smoke sensors)Considerations for installation of sensorsProper testing of smoke sensorsWater based systems i.e. deluge, wet-pipe, dry-pipe, pre-action and why most of them don't work and how to detect thisDetails on Inert and Halocarbon systems and how to select the correct system for your data centreHow to calculate the gas content ensuring the appropriate level is installed to suppress the fire including safety considerationsOther requirements for gas systems such as release times, hold times, pipe install requirements and other important factorsRequirements for the fire detection panelInstallation verification, methods, what to check and howNew advanced fire suppression technologies
9 - Design and Install Scalable Networking Cabling System
ANSI/TIA942 cabling structure topologyToR, EoR DesignIntelligent patching systemsInstallation best practice such as routing, bending radius, separation from power, containment fill ratio, fiber link loss calculator, bonding and grounding requirementStandard for telecommunications labeling and administration
10 - Environmental Specifications and Contamination Control
Acoustic noise effects, regulations, specifications and limitsData centre contaminations and classificationsMeasurements, standards and limitsPreventive measures and avoidance
11 - Data Centre Efficiency
Business drivers to go GreenHigh-availability or Green?Green guidelines and standardsHow to measure it and what are acceptable numbers compared to the general industryPUE classes defined by Green Grid and issues with PUETechniques for saving energy in all parts of the data centre i.e. application/system level, cooling, power distribution
12 - Mock Exam
13 - EXAM: Certified Data Centre Specialist